Wendler 5/3/1
Monthly cycle
Prerequisites
- • All core concepts
- • All barbell lifts (Back Squat, Front Squat, Deadlift, Press)
- • Minimum 6 months of consistent barbell training
- • Established 1RMs for all four main lifts
Wendler 5/3/1
Wendler 5/3/1 is a monthly-cycle strength program built around four main lifts: Back Squat, Bench Press, Deadlift, and Press. Every session is built from a percentage of a β not your true β and every cycle ends with an set that drives progression.
Overview
The program is organized in 4-week cycles:
- Week 1: 5/5/5+ ( is 5+ reps)
- Week 2: 3/3/3+ (top set is 3+ reps)
- Week 3: 5/3/1+ (top set is 1+ reps)
- Week 4: (light sets, no AMRAP)
All weights are percentages of your Training Max, which is 90% of your true 1RM. Progression happens through the AMRAP set β the more reps you hit, the more your Training Max rises next cycle.
Who It Is For
Wendler 5/3/1 is for athletes who have trained consistently for at least six months, have established 1RMs on all four main lifts, and want a sustainable program they can run for years. It is one of the most tested intermediate strength programs in the world.
Prerequisites
- Complete all foundational concepts.
- Master all four main lifts.
- Establish 1RMs (or estimate from recent AMRAP).
- Know how to run a Training Max calculation (90% of 1RM).
The Four Lifts
- Back Squat
- Bench Press
- Deadlift
- Press
Weekly Structure
Wendler is flexible. The most common template is 4 days per week:
| Day | Focus |
|---|---|
| Monday | Press |
| Tuesday | Deadlift |
| Thursday | Bench Press |
| Friday | Back Squat |
Alternative templates: 3 days, 2 days, or 6 days. The cycle structure stays the same regardless.
Cycle Structure
| Week | Set Structure | Percentages |
|---|---|---|
| Week 1 | 3 sets: 5 / 5 / 5+ | 65% / 75% / 85% of TM |
| Week 2 | 3 sets: 3 / 3 / 3+ | 70% / 80% / 90% of TM |
| Week 3 | 3 sets: 5 / 3 / 1+ | 75% / 85% / 95% of TM |
| Week 4 | Deload: 3 sets of 5 at 40/50/60% | Recovery week |
The β+β means AMRAP β as many reps as possible at that weight.
Progression Rules
After each cycle, recalculate your Training Max:
- Take the weight used on your top set.
- Multiply by reps performed.
- Multiply that by 0.0333.
- Add the top set weight to that number.
- The result is your new estimated 1RM.
- Multiply by 0.9 β thatβs your new Training Max.
Or simpler: add 5 lbs to Press and Bench, 10 lbs to Squat and Deadlift after each successful cycle.
Autoregulation in Practice
Wendler is highly structured but leaves room for adjustment:
- On the AMRAP set, push hard but stop 1 rep before technical failure.
- On bad days, aim for the minimum reps β progress still accumulates.
- If a cycle fails (miss reps on top set), drop Training Max by 10% and rebuild.
Sample 4-Week Cycle
Assume Training Max of 300 lbs on Squat:
Week 1: 195x5, 225x5, 255x5+ Week 2: 210x3, 240x3, 270x3+ Week 3: 225x5, 255x3, 285x1+ Week 4: 120x5, 150x5, 180x5 (deload)
Assistance Work
Wendler recommends βBoring But Bigβ (BBB) as the default assistance template:
- After the main lift, do 5x10 of the same lift at 50-60% of Training Max.
- Or 5x10 of the opposite lift.
Other templates: Triumvirate, Bible, Bodyweight.
When to Switch Programs
Wendler is designed to be run for years. Consider switching when:
- You want to specialize (Smolov, Smolov Jr.).
- You want focus (PPL).
- You want a different strength approach (Texas Method).
Common Pitfalls
- Using true 1RM instead of Training Max (should be 90%).
- Going to failure on AMRAP.
- Skipping the deload week.
- Adding weight faster than the program prescribes.
- Doing too much assistance work.
Related Programs
- Texas Method β weekly progression alternative.
- PPL β hypertrophy-focused alternative.
- Smolov β squat specialization.
- Starting Strength / StrongLifts β predecessors.
Journal
Uses the Training Log β Wendler 5/3/1 template.